SR 369 CORRIDOR ANALYSIS

SCOPE

Foresite Group, along with American Engineers (AEI), held an on-call contract with Forsyth County. Our team was tasked with widening SR 369 from two lanes to four lanes from SR 9 to SR 306 for a two-mile span. Our team performed a traffic analysis along the entire corridor, designed improvements for all affected intersections, and provided traffic signal design for a new interchange on GA 400, which our team worked on concurrently. Coordination with Forsyth County DOT was necessary to ensure the corridor design provided adequate facilities for future traffic volumes.

LOCATION

Forsyth County, Georgia

SERVICES

Traffic Engineering