top of page

MEDICAL OFFICE BUILDING AND TRAINING FACILITY

SCOPE

This project consists of a new two-story medical office building (41,500sf) and a single-story sports training facility (15,000sf) completed by Foresite Group’s Structural Engineering team. The medical office building is a steel frame with composite metal deck and braced frames for the lateral force resisting system. This project included relocation of x-ray rooms and an added whirlpool room. Our team provided schematic design, design development, construction documents, and construction phase services.

LOCATION

Hattiesburg, Mississippi

SERVICES

Structural Engineering

Foresite Group Logo
  • Facebook
  • X
  • Instagram
  • LinkedIn

© 2025 Foresite Group, LLC.  All Rights Reserved.
Terms of Use  |  Privacy Policy

 

Affiliated company of Level-Up Towers and

Level-Up Companies

bottom of page